Reserve estimate — p/Z (workbook: gas reserve estimate)
Well data, marches and the matched IPR are taken from the Well model module.
1. Prod data & macro (Pres solver)
2. Pres from SITHP
3. Reservoir limit (constant rate)
4. Pres from memory gauges
prod_data — inputs green (CGR/WGR blank = base), outputs dt / pr / z filled by the solver
Paste from clipboard
Import CSV
+10 rows
Clear
or click a cell and Ctrl+V (Date, FTHP, q, CGR, WGR, Pwf)
Static surveys — q = 0 rows, Pres by the static gas march (well-model data + geothermal temp). Gp is taken from the cumulative of the prod data table (selection 1).
Paste from clipboard
Import CSV
+10 rows
Clear
or click a cell and Ctrl+V (Date, STHP, rate, CGR, WGR)
Memory-gauge surveys — inputs Date and Pr (the static, built-up reservoir pressure at datum); z, Gp and p/Z are calculated. Gp is taken from the cumulative of the prod data table (selection 1).
Paste from clipboard
Import CSV
+10 rows
Clear
or click a cell and Ctrl+V (Date, Pr)
Reservoir limit (workbook sheet): m = −slope(Pwf, t) over all rows, Ct = Cg·Sg + Co·So + Cw·Sw + Cf, GIIP = q̄/(Ct·m)
Run selected method → GIIP